Safety first at Carlsberg, Alwar: Working on curved dome roofs - CleanMax
  • Home >
  • Projects >
  • Safety first at Carlsberg, Alwar: Working on curved dome roofs

Safety first at Carlsberg, Alwar: Working on curved dome roofs

Overview
Carlsberg believes that sustainability is vital to their business. Carlsberg’s environmental policy with respect to energy usage is to strive to use all kinds of energy sources as effectively as possible, and regularly assess the possibilities of introducing renewable energy in order to reduce their carbon footprint.

Carlsberg India partnered with CleanMax Solar with an aim to develop India’s first solar brewery at Alwar and Daruhera, with a Power Purchase Agreement (PPA). CleanMax Solar helped Carlsberg achieve the following threefold benefit: 1. Going green, 2. No capital investment 3. Saving money on electricity units.

For CleanMax Solar engineers, the unique dome-shaped rooftop at their Alwar facility involved various challenges and safety precautions had to be considered before the installation.

Quick Facts

  • LocationAlwar, Rajasthan
  • Capacity471 kWp
  • Type of systemDome-Shaped Metal Roof
  • Annual generation6.7 lacs units
  • Carbon dioxide abated620 tons annually
  • Date of commissioningMarch 2016

Challenges

  • Height of the building
  • No access to the rooftop
  • Slanted shape of the rooftop
  • High wind speed
  • The dome-shaped metal roof of the brewery at Alwar is 20 meters high and at each end of the roof is a sharp curve slanting towards the ground. The daunting task was to install solar modules at the height of 20 meters on a curvy roof, where it is extremely difficult for people to even stand properly. This problem was further compounded by high wind speeds, due to the high altitude, and the lack of access to the rooftop.

Solution
Safety first: While working at heights and on Dome-Shaped Metal Roofs
Engineers from CleanMax Solar enabled access to the roof, without compromising the safety of the existing infrastructure. They established an access route to the rooftop by setting up a ladder through which a safety line with harnesses and ropes was set around the dome. The wires with anchor points were designed to hold project staff and save them from falling from the rooftop. A walkway was created to enable easy movement across the roof.

The workers at the site were given special training at the beginning of each day, to highlight the risks and precautions to be taken for the day’s activities. To ensure maximum safety, a dedicated resource monitored the wires and ropes for their strength at all times. This additional safety measure ensured prompt action in case of emergency.

Highlights

  • Heavyweight solar modules installed at the height of 20m on a curved roof
  • Special training provided to workers each day to ensure maximum safety
  • Project completed in a record 60 days
  • Despite the mammoth challenge, the turnkey project was completed in record 60 days after the PPA was signed and the plant was commissioned in March 2016. The “safety first” approach enabled a swift and easy installation.

About Carlsberg India
Carlsberg Group’s operations in India began in May 2006 with the creation of South Asia Breweries Pvt. Ltd, which in 2009 was renamed as Carlsberg India Private Limited. In March 2008, Carlsberg expanded its operations by establishing its second brewery in Alwar, Rajasthan. The brewery uses modern technology and the very best of fresh ingredients to brew great beers consistently.

Disclaimer:
The document contains information based on project undertaken by Clean Max Enviro Energy Solutions Pvt. Ltd. While due care has been taken to ensure the accuracy and completeness of the information supplied herein, Clean Max Enviro Energy Solutions Pvt. Ltd. cannot be held responsible for any errors or omissions.

Safety first at Carlsberg, Alwar: Working on curved dome roofs

Overview
Carlsberg believes that sustainability is vital to their business. Carlsberg’s environmental policy with respect to energy usage is to strive to use all kinds of energy sources as effectively as possible, and regularly assess the possibilities of introducing renewable energy in order to reduce their carbon footprint.

To read the full case study, please fill out the brief form below.

© Copyright 2018. All Rights Reserved. Clean Max Enviro Energy Solutions Pvt. Ltd.

Enquire Now