Konecranes Pune Factory: First solar plant to be installed at Konecranes globally!

Konecranes Solar Plant

Overview
Sustainable growth is what drives the management at Konecranes. It’s the same aspiration to adopt eco-friendly business practices that convinced Konecranes to go solar by bringing their first ever solar plant at Jejuri near Pune, Maharashtra. The company collaborated with CleanMax Solar to achieve their dream of sustainable growth. Thus began a partnership, which gave Konecranes its first ever solar plant globally at Jejuri near Pune, Maharashtra.

Konecranes management was highly impressed with the BOO (Build Own Operate) model. Under this arrangement, Konecranes could get solar power plant with no investment or operational risks, and the billing would be done as per the plant generation. CleanMax Solar took upon itself the responsibility to maintain the plant and ensure uninterrupted power generation. Subsequently, structural stability analysis was done which suggested that the company could install 730 kWp solar power plant on its roof and generate approximately 11 lac units annually.

Quick Facts

  • LocationPune (Jejuri)
  • Capacity730 kWp
  • Type of systemMetal roof
  • Annual generation11 lac units
  • Carbon dioxide abated1096 tons annually
  • Date of commissioningAugust 2016

Challenges
Safety Measures

  • As an organisational policy, CleanMax Solar takes efficient safety measures during plant installation to avoid any work-related accident. End to end harnesses, safety gears, lifelines and high-quality personnel protection equipment (PPE) were used. Executive ladders were placed for people inspecting the plant and skylight demarcation was highlighted.
  • Getting required approvals and permissions from various State govt. departments for Net Metering is a time-consuming process, so CleanMax Solar liaisoning team ensured a hassle-free experience by taking the ownership of getting all the necessary statutory approvals.

Solutions

  • Sustainable business practice
    The plant is spread across an area of 7,300 sq m and is expected to generate 11 lac units annually. To ensure smooth functioning and on par performance, high-quality inverters and controllers having intelligent load management between solar, grid and diesel generators have been used. The plant was commissioned in August 2016 and is expected to reduce Konecranes’ carbon footprints by 2,575 tons during the lifetime of the project. This is equivalent to saving almost 11,500 trees. In fact, the plant will also help reduce the temperature in shop floor work area by 1.5 to 2 degrees as heat absorption shall take place at roof by solar panels.
  • Net metering
    The plant has been working in accordance with net metering, allowing periodic surpluses, such as on weekly holidays to be exported back to the grid in a manner where Konecranes gets credit for the units exported to the grid. The plant is expected to save around 17% of electricity bills, starting right from the first day of generation, amounting to more than Rs 25 lacs annually.
  • Remote Monitoring
    In order to ensure hassle-free power generation, the plant will be monitored 24X7 through remote monitoring system installed by CleanMax Solar. This will provide crucial data such as live energy generation, plant performance over the years and the saving achieved so far. This will help quick decision making and turn around time for operations & maintenance team to resolve any plant performance issues that may arise.

Highlights

  • Konecranes’ first facility to go solar across continents
  • Electricity cost reduction of up to Rs 25 lacs annually
  • Plant performance will be monitored 24X7 through remote monitoring system
  • Solar plant with net metering for additional cost saving

About Konecranes
With over 12,000 employees at 600 locations in 48 countries, Konecranes is a world-leading group of lifting businesses, serving a broad range of customers, including manufacturing and process industries, shipyards, ports and terminals.

Disclaimer:
All information, products, services, or related graphics contained in the document is copyrighted to CleanMax Enviro Energy Solutions Pvt. Ltd. due care has been taken to ensure the accuracy and completeness of the information supplied herein, any claim you place on such information is therefore strictly at your own risk.

Konecranes Pune Factory: First solar plant to be installed at Konecranes globally!

Konecranes Solar Plant

Overview
Sustainable growth is what drives the management at Konecranes. It’s the same aspiration to adopt eco-friendly business practices that convinced Konecranes to go solar by bringing their first ever solar plant at Jejuri near Pune, Maharashtra. The company collaborated with CleanMax Solar to achieve their dream of sustainable growth. Thus began a partnership, which gave Konecranes its first ever solar plant globally at Jejuri near Pune, Maharashtra.

To read the full case study, please fill out the brief form below.